turkey

Anchoring Off Bitez

When I first took Esper out with a couple of skippers on board, my anchoring techniques left a lot to be desired. I was determined to make the effort to try and anchor the next few times I went out for a sail.

Anchoring Off Bitez Read Post »

Around Kara Ada

This second trip from Bodrum was a trip around Kara Ada itself, this time with just Salih and Bilge. For me this was an important moment as it was the first time I had ever sailed a boat as the most experienced person aboard. Even on the Aquarium trip I accompanied by three qualified skippers, two of whom were Yachtmasters, so this was a great mental leap forward for me.

Around Kara Ada Read Post »

Checking out the fish in the Aquarium

It had been two weeks since I touched down in Bodrum with the intention of getting Esper ready for a season of sailing. In that time we had managed to take her out once, a quick motor from Yat Lift to the marina, a grand total of two kilometres! After getting her into the marina I had been itching to get her back out for a proper sail but the weather just hadn’t allowed it.

Checking out the fish in the Aquarium Read Post »

Sailing In And Around Bodrum

The “Bodrum Files” is a short collection of log entries that highlight the first few ‘proper’ sailing trips in and around Bodrum. There will be many more trips in this area in the near future but these just document the early trips undertaken in April, 2005. It was a time to get to grips with Esper and also offer up some fun for a few friends.

Sailing In And Around Bodrum Read Post »

Boat Power Sources

After reading the yacht-owner’s bible (Nigel Calder’s ‘Boatowner’s Mechanical and Electrical Manual’, published by Adlard Coles Nautical) we had a serious rethink about our power sources. Eventually we will be looking to install solar panels but in the short term we had to make an educated guess at what our daily power consumption would be and put that within the context of buying new batteries and battery charger.

Boat Power Sources Read Post »

The Deck

The initial survey report had indicated that a few of the deck planks required replacing and recaulking, whilst we were aware that some of the stanchion bases had come loose. Indeed two of the stanchion bases were leaking slightly, so we got eleven of the twelve bases replaced, and replaced two of the planks.

The Deck Read Post »

Scroll to Top