Esper Refit 31 – shaft crevice corrosion

Removing a Maxprop from the shaft Esper

Bad news this week as we inspect our shaft, which has some corrosion. We turn to Vyv Cox of Coxengineering to find out how and why this has happened. Meanwhile we attempt to offer the swimming platform up to the transom, only to find it is a little too big.

Read more...

Esper Refit 30 – boat led lights

Two big projects this week: the removal of a blockage in the mast conduit and the interior lights. The lights are on-going but the removal of the blockage took three days and was only achieved by Moo’s brainwave.

Read more...

Esper Refit 6 Month Round-up

Pong and Liz celebrate six months in the yard

We’ve been in the yard for six months now, and this week’s round-up, which covers all the work so far, coincides with Jamie’s return. The ceiling is going up and the mast is being dressed.

Read more...

Esper Refit 25 – teak toe rail; rubbing strake

Pong, head carpenter, and Un, project manager of PSS Boatyard, Satun, Thailand

As usual the busiest man on the Esper refit project is Pong, the head carpenter. He’s been assisted by his sons in finishing off the new teak toe rail and the teak rubbing strake down the side of the boat. Sombat, meanwhile, cracks on with the electrics.