The vertical crack to the right was ground out, whilst the horizontal filler was removed and replaced. The hole was plugged and filled too. The corner will now be built up with glassfibre to strengthen this area
The vertical crack to the right was ground out, whilst the horizontal filler was removed and replaced. The hole was plugged and filled too. The corner will now be built up with glassfibre to strengthen this area