This week has probably been the most eventful to date, and I’m not just talking about Esper’s progress. On Wednesday half of Chebilang turned out to watch a fishing boat burn right down to its hull, whilst a ferry bottoms out when being jacked up on a cradle. Other breakages include feet and motorbikes.
Esper Refit 32 – welding and polishing swim platform
First week without Liz. After dropping her off at Hat Yai airport Moo and I visit the machine shop to try and get the swimming platform bent. Instead we get told off for filming on their premises. I wonder why?
Esper Refit 31 – shaft crevice corrosion
Bad news this week as we inspect our shaft, which has some corrosion. We turn to Vyv Cox of Coxengineering to find out how and why this has happened. Meanwhile we attempt to offer the swimming platform up to the transom, only to find it is a little too big.
Esper Refit 30 – boat led lights
Two big projects this week: the removal of a blockage in the mast conduit and the interior lights. The lights are on-going but the removal of the blockage took three days and was only achieved by Moo’s brainwave.
Esper Refit 6 Month Round-up
We’ve been in the yard for six months now, and this week’s round-up, which covers all the work so far, coincides with Jamie’s return. The ceiling is going up and the mast is being dressed.