Esper – Post Refit First Look

Esper from above

As you can imagine, when we dropped the hook in Bass Harbour, Langkawi, 25 miles away from PSS Shipyard, we did absolutely nothing for a whole week. It was bliss.

Read more...

Esper Refit 46 – Christmas Special

Muslim girls at a Burmese wedding

As Christmas approaches we are inundated with rain, rain and more rain. It’s just like being back in the UK! We still had fun, attending a Burmese wedding and rehousing some little animals.

Read more...

Esper Refit 35 – PSS Dripless Seal; LED Dimmer

where the shaft enters into the boat

Dang the varnisher’s back, as are the electricians. The sparkies have finally installed the LED dimmer switch and it looks good. Dang is preparing the boat for its last coat of varnishing whilst I remove the old stuffing box in preparation for the new PSS Dripless Seal.

Read more...

Esper Refit 33 – boat catches fire; redrilling deck fittings;

Fishing boat catches fire at Chebilang, Thailand

This week has probably been the most eventful to date, and I’m not just talking about Esper’s progress. On Wednesday half of Chebilang turned out to watch a fishing boat burn right down to its hull, whilst a ferry bottoms out when being jacked up on a cradle. Other breakages include feet and motorbikes.

Read more...

Esper Refit 31 – shaft crevice corrosion

Removing a Maxprop from the shaft Esper

Bad news this week as we inspect our shaft, which has some corrosion. We turn to Vyv Cox of Coxengineering to find out how and why this has happened. Meanwhile we attempt to offer the swimming platform up to the transom, only to find it is a little too big.

Read more...

Esper Refit 30 – boat led lights

Two big projects this week: the removal of a blockage in the mast conduit and the interior lights. The lights are on-going but the removal of the blockage took three days and was only achieved by Moo’s brainwave.

Read more...

Esper Refit 6 Month Round-up

Pong and Liz celebrate six months in the yard

We’ve been in the yard for six months now, and this week’s round-up, which covers all the work so far, coincides with Jamie’s return. The ceiling is going up and the mast is being dressed.

Read more...